Weston, FL · South Florida · 2026

How much does a deck cost in Weston?

Weston decks are mostly pool decks and screened patios by the lakes; PVC and pavers stay cooler underfoot.

Quick answer

A 12 × 16 ft raised deck with stairs and railing costs about $12,800 in pressure-treated wood or $19,300 in composite in Weston, which is about 14% above the national average.

Updated November 2026 · Prices are installed ballparks from our free estimator, not a contractor bid.

Why do decks cost more in Weston

Labor costs in the South Florida area run above the national average, which puts deck prices in Weston about 14% above our national ballpark. Stainless hardware and wind-rated connections add to the cost of decks here.

Weston is a master-planned Broward County city on the edge of the Everglades, built mostly in the 1990s and 2000s, with tile-roofed homes around lakes.

Our estimator applies the same Weston adjustment when you price a deck at a Weston address, so this page and your estimate match.

Weston vs. national ballpark

+14%

12 × 16 ft composite deck, national
$16,896
Same job in Weston
$19,261

Weston deck prices by material

Installed, at Weston prices: per square foot, and for a 12 × 16 ft deck raised 2–6 ft with one set of stairs and railing on three sides.

Deck cost in Weston by material
MaterialPer sq ft12 × 16 ft deck onlyWith stairs & railing
Pressure-Treated Wood$40–$60$9,412$12,763
Cedar$51–$72$11,601$14,952
Composite$68–$89$14,884$19,261
PVC$80–$100$17,073$21,861

Best decking for Weston

  1. 1
    PVC

    Can't absorb water, so salt, rain and humidity don't rot or swell it.

  2. 2
    Composite

    No staining or splinters; choose a light, heat-mitigating color for full sun.

  3. 3
    Pressure-Treated Wood

    The budget choice; plan on sealing it every couple of years.

Building a deck in Weston: what to plan for

Hurricane winds

Decks here need hurricane ties, stronger ledger connections and stainless or hot-dipped galvanized hardware. Loose furniture and pergola covers become projectiles, so plan where they go.

Humidity and termites

Humid climates mean mildew and termites. Keep wood off the soil, use treated framing, and consider composite or PVC boards that termites won't eat.

Heat underfoot

Dark composite and PVC can get uncomfortably hot in full sun. Pick lighter colors or heat-mitigating boards, and plan shade.

Deck permits in Weston

Most decks attached to a house, more than 30 inches off the ground or larger than 200 sq ft need a building permit, and many places are stricter. In Weston, permits come from the City of Weston. If you're in an HOA, get its approval too.

Florida roofers must hold a state roofing contractor license (certified) or a local registration; check it on the DBPR website.

Weston deck FAQ

How much does a deck cost in Weston?

With our Weston prices, a 12 × 16 ft deck raised 2–6 ft with stairs and railing costs about $12,800 in pressure-treated wood or $19,300 in composite. That's about 14% above the national average.

Why do decks cost more in Weston?

Labor costs in the South Florida area run above the national average, which puts deck prices in Weston about 14% above our national ballpark. Stainless hardware and wind-rated connections add to the cost of decks here.

What's the best decking for Weston?

PVC: Can't absorb water, so salt, rain and humidity don't rot or swell it. Composite: No staining or splinters; choose a light, heat-mitigating color for full sun. Pressure-Treated Wood: The budget choice; plan on sealing it every couple of years.

Do I need a permit to build a deck in Weston?

Most decks that are attached to the house, more than 30 inches off the ground or over 200 sq ft need a permit from the City of Weston, and local rules can be stricter. Check before you build, and get HOA approval if you have one.

Does a deck need a railing?

Building codes based on the IRC require a guard (railing) on any open side where the deck surface is more than 30 inches above the ground below, at least 36 inches tall for most homes, with gaps small enough that a 4-inch ball can't pass through. Stairs with four or more risers need a graspable handrail.

How long does it take to build a deck?

A typical 200–400 sq ft deck takes a professional crew a few days to two weeks once materials and permits are in hand. Permits, inspections and contractor schedules often add more time than the build itself, so start planning a couple of months before you want to use it.

Related guides

See what your Weston deck would cost

Trace it on your own house and get an itemized price at local rates in about two minutes. Free.