How much does a deck cost in Lake Forest?
Lake Forest's ravine lots mean many decks overlook slopes and trees; expect engineering for tall decks and deep frost footings.
Quick answer
A 12 × 16 ft raised deck with stairs and railing costs about $13,000 in pressure-treated wood or $19,600 in composite in Lake Forest, which is about 16% above the national average.
Updated November 2026 · Prices are installed ballparks from our free estimator, not a contractor bid.
Why do decks cost more in Lake Forest
The Chicago area has some of the highest construction labor costs in the country, and deck builders here charge accordingly, so expect prices about 16% above our national ballpark. Footings below the frost line and framing sized for snow add to the cost of every deck here.
Lake Forest is one of the North Shore's wealthiest towns, with historic estates, ravine lots and large homes on Lake Michigan bluffs.
Our estimator applies the same Lake Forest adjustment when you price a deck at a Lake Forest address, so this page and your estimate match.
Lake Forest vs. national ballpark
+16%
- 12 × 16 ft composite deck, national
- $16,896
- Same job in Lake Forest
- $19,599
Lake Forest deck prices by material
Installed, at Lake Forest prices: per square foot, and for a 12 × 16 ft deck raised 2–6 ft with one set of stairs and railing on three sides.
| Material | Per sq ft | 12 × 16 ft deck only | With stairs & railing |
|---|---|---|---|
| Pressure-Treated Wood | $41–$61 | $9,577 | $12,987 |
| Cedar | $52–$73 | $11,804 | $15,215 |
| Composite | $70–$90 | $15,145 | $19,599 |
| PVC | $81–$102 | $17,372 | $22,244 |
Best decking for Lake Forest
- 1Composite
Handles freeze-thaw and snow without splitting or needing sealant.
- 2Cedar
Real wood that resists rot naturally; seal it every year or two.
- 3Pressure-Treated Wood
The budget choice; plan on sealing it every couple of years.
Building a deck in Lake Forest: what to plan for
Snow and frost
Footings must go below the local frost line so the deck doesn't heave, and the frame must carry snow load. Shovel with a plastic shovel to protect composite boards.
Severe storms
Wind loads matter for tall decks, pergolas and roofs over decks. Ask your builder about post bracing and lateral load connectors at the house.
Deck permits in Lake Forest
Most decks attached to a house, more than 30 inches off the ground or larger than 200 sq ft need a building permit, and many places are stricter. In Lake Forest, permits come from the City of Lake Forest. If you're in an HOA, get its approval too.
Illinois is one of the few states that licenses roofers statewide; ask for the roofer's state roofing license number.
Lake Forest deck FAQ
How much does a deck cost in Lake Forest?
With our Lake Forest prices, a 12 × 16 ft deck raised 2–6 ft with stairs and railing costs about $13,000 in pressure-treated wood or $19,600 in composite. That's about 16% above the national average.
Why do decks cost more in Lake Forest?
The Chicago area has some of the highest construction labor costs in the country, and deck builders here charge accordingly, so expect prices about 16% above our national ballpark. Footings below the frost line and framing sized for snow add to the cost of every deck here.
What's the best decking for Lake Forest?
Composite: Handles freeze-thaw and snow without splitting or needing sealant. Cedar: Real wood that resists rot naturally; seal it every year or two. Pressure-Treated Wood: The budget choice; plan on sealing it every couple of years.
Do I need a permit to build a deck in Lake Forest?
Most decks that are attached to the house, more than 30 inches off the ground or over 200 sq ft need a permit from the City of Lake Forest, and local rules can be stricter. Check before you build, and get HOA approval if you have one.
Does a deck need a railing?
Building codes based on the IRC require a guard (railing) on any open side where the deck surface is more than 30 inches above the ground below, at least 36 inches tall for most homes, with gaps small enough that a 4-inch ball can't pass through. Stairs with four or more risers need a graspable handrail.
How long does it take to build a deck?
A typical 200–400 sq ft deck takes a professional crew a few days to two weeks once materials and permits are in hand. Permits, inspections and contractor schedules often add more time than the build itself, so start planning a couple of months before you want to use it.